Project Map
A large technical drawing showing the project scope.
The construction will include a 4-lane roadway and a partial continuous left turn lane with new asphalt pavement, installation of curb and gutter, sidewalks, ADA compliant curb ramps, concrete bus pads, signage, pavement markings, utility improvements to water, wastewater, gas, and stormwater.