North Beach Area Road Improvements & Area Beautification
Bond: 2012
Amount: $1,100,000

This project includes landscaping enhancements, roadway surface and pedestrian improvements for Surfside Blvd, Breakwater Ave, Pearl Ave, N. Shoreline Blvd., Bridgepoint Ave, Coastal Ave and the medians along the Highway 181 entrances to North Beach. 

Council Presentation October 16, 2018 »
Memo Construction Contract »
Project Budget Estimate »
Location Map »
Recommendation of Award »

_______

North Beach Breakwater, Plaza, North Shoreline Repair and Enhancement 
Bond: 2012
Amount: $1,750,000

This project includes repairs and improvements to the Breakwater sidewalk, on-street parking enhancements, pedestrian improvements and Breakpoint Plaza enhancements. 

Council Presentation October 16, 2018 »
Memo Construction Contract »
Project Budget Estimate »
Location Map »
Recommendation of Award »

_______

Gulden (Dead End E to Surfside)
Bond: 2014
Amount: $410,000

_______

Shoreline North (Coastal to Pearl)
Bond: 2014
Amount: $1,130,000

_______

Breakwater Park, 2800 North Shoreline
Bond: 2014

.15 Acreage

_______

Beach Avenue (E. Causeway Blvd to Dead End at Gulf breeze Blvd)
Bond: 2018
Amount: 1,000,000

Reconstruction of 2-lane roadway with new pavement, curb & gutter, sidewalks, ADA compliant curb ramps, signage, pavement markings, and illumination. Includes bike mobility improvements per the adopted MPO bicycle mobility plan and approved in North Beach Area Plan. 

_______

North Beach Area Primary Access (Beach & Timon to Surfside Intersection)
Bond: 2018
Amount: $1,250,000

Design and construction of a new curved access road from E. Causeway Blvd. onto Timon Blvd. with new traffic circle at intersection of Timon/Surfside and Beach roads. Provides a new route for the single access road into North Beach from the new Harbor Bridge. Traffic circle connects Timon/Surfside and Beach and coverts Beach Ave. to one-way from Surfside to E. Causeway Blvd. New Traffic circle also allows development of new gateway feature for the entry into North Beach approved in the North Beach Area Plan. 

_______

North Beach Gulf Spray Avenue Pedestrian & Bike Access (Beach Access to E. Causeway Blvd)
Bond: 2018
Amount: $300,000

Pedestrian and bicycle infrastructure improvements to create a new trail for improve access from the Harbor Bridge and the beach approved in the North Beach Area Plan. 

_______

North Beach Coastal Protection
Bond: 2018
Amount: $250,000

Preliminary engineering and permitting with USACE, GLO, Port of Corpus Christi and other agencies for the design and construction of new breakwater barriers to mitigate beach erosion and coastal flooding and approved in the North Beach Area Plan. 

_______

North Beach Restrooms & Parking Facilities​​​​​​​
Bond: 2020
​​​​​​​Amount: $2,500,000
The construction of a new restroom facility and renovation of existing parking lot.