Skip to main content
A new website is coming soon!

PROJECT FACTS


Project Consultant Engineering:         LJA Engineering

City Project Manager:                          Mai-Theresa Bernal, P.E.

Contractor:                                            Bay, LTD

Construction Inspector:                       James Ramirez

Liquidation Damages:                          $1,750

Award Date:                                          July 2019

Construction Start:                              January 20, 2020

Anticipated Completion:                     July 31, 2021

Total Project Value:                              $11,462,907


________
 

MAPS & TECHNICAL DRAWINGS


Project Overview (E12101) Crosstown Expy. to Staples St. »
A large technical drawing showing the scope of the section funded by Bond 2012.

Project Overview (E13090) Staples St. to Ocean Dr. »
A large technical drawing showing the scope of the section funded by Bond 2014.